Course Objectives
By the end of this course, you will be able to:
- Discuss the time value of money
- Describe the difference between nominal and effective interest rates
- Analyze engineering problems using present worth, annual cost, and other analysis methods
- Discuss the implications of tax effects in project analysis
SUBJECT MATTER EXPERT: Lee Layton, P.E.
Mr. Layton holds a BS in electrical engineering from Auburn University and an MBA. He is a licensed professional engineer in Georgia and North Carolina. He has over 35 years experience in the electric utility industry. His area of expertise includes distribution design, planning, metering, system operations, and relaying.
Mr. Layton has taught numerous training courses for other utility professionals in the areas of metering, relaying, equipment application, and distribution line design and authored over 100 papers on utility operations.
State Licenses
AK - Land Surveyor (General)
AL - Land Surveyor (General)
AR - Land Surveyor (General)
GA - Land Surveyor (General)
IA - Land Surveyor (General)
ID - Land Surveyor (General)
IL - Land Surveyor (General)
KS - Land Surveyor (General)
LA - Contractor, Residential (General)
LA - Land Surveyor (General)
MD - Land Surveyor (General)
ME - Land Surveyor (General)
MN - Land Surveyor (General)
MS - Land Surveyor (General)
MT - Land Surveyor (General)
NC - Land Surveyor (General)
ND - Land Surveyor (General, Technical)
NJ - Engineer (General - 24GP000006300)
NM - Land Surveyor (General)
NV - Land Surveyor (General)
OH - Land Surveyor (General)
OK - Land Surveyor (General)
SC - Land Surveyor (General)
SD - Land Surveyor (General, Technical)
UT - Land Surveyor (General)
VA - Land Surveyor (General)
WA - Land Surveyor (General)
WI - Land Surveyor (General)
WY - Land Surveyor (General)