RedVector
RV-PGM237
NC - 2023 NEC Changes: Alternative Energy and Fire Pumps/Emergency Systems (PGM)
Course Objectives
After successfully completing this course, you will be able to:
- Discuss the recognition of floating PV arrays in 690.4
- Discuss the evolution of line-side connections of interconnected sources in 705.11
- State why Article 722 was created
- Explain what a Class 4 system is in the new Article 726
- List the new requirements for load management in 750.30
- Explain why the title of Article 810 was changed
- Explain what Article 695 does and does not cover according to 695.1
- Recall the voltage drop requirements for fire pumps in 695.7
- Recall the new and revised definitions in Article 100 that apply to emergency systems
- List the requirements for parallel sources of emergency power in 700.4
- State the requirements for Class 2 lighting and emergency systems in 700.11 and 700.27
- Discuss the selective coordination requirements of 700.32 for emergency systems
Courses in this Package
Course Title
Avg. Rating
Hours
Level
State Licenses
NC - Electrician, Special Restricted Contractors (General - CEC.05708)
NC - Electrician, Unlimited, Intermediate, Limited, Residential Dwelling (General - CEC.05708)